首页 > 工作 > 求职文档 > 自我鉴定 > 自我评价 > 工程人员英文自我评价(3篇)正文

《工程人员英文自我评价(3篇)》

时间:

工程人员英文自我评价(精选3篇)

工程人员英文自我评价 篇1

1, understand the drawings, information, equipment, cad and so on. Can be hard-working, enterprising. Responsible for the overall deployment of the construction site, the general layout.

2, coordination of the construction of the labor layer progress, quality, safety. The implementation of the overall construction program.

3, the service layer assessment, evaluation.

4, supervision of the service layer according to standard construction, to ensure safe production, civilized construction. Comprehensive and reasonable and effective implementation of the program to keep the construction site safe and effective.

5, proposed to ensure construction, safety, quality measures and organize the implementation.

6, urge the construction materials, equipment on time, and in a qualified state to ensure the smooth progress of the project.

7, to participate in the project completion inspection, responsible for the project intact protection.

8, on-time and accurate record of construction log.

9, the rational allocation of production factors, and strictly organize the construction to ensure project progress and quality.

10, the organization concealed project acceptance, to participate in sub-sub-project quality assessment.

11, to participate in the drawing of the trial and the preparation of the progress of the project with a grateful heart of life, with love to do business.Computer skills: intermediate language proficiency: English (general); Mandarin (good) precise operation of equipment, cad, site coordination and management, pre-technical technology to the end of the quality axis elevation. Be familiar with and make drawings, data, construction plans, contracts.

工程人员英文自我评价 篇2

This practice makes me deeply feel the difference between theory and practice, from now on, not only to seriously learn the theory of knowledge, but also to focus on strengthening the practical hands-on ability to make their own more comprehensive development of a comprehensive development of the project, . At the same time, engineering measurement is also a technical live, it needs to measure personnel seriously, careful, patient; team members should also work together, as far as possible in all aspects of measurement to maintain a high accuracy, the only way to efficiently complete our Of the measurement tasks.

In fact, this measurement makes me feel the deepest is the close cooperation between the players, measurement has just begun, we are a group of nine people is not clear division of labor, the results of measurement work was very slow, but we soon found Measurement work is included in all aspects, and we immediately assigned a good task, have defined their own work, such as: in the measurement of elevation, the need for two feet to help the staff in two turning points to help leveling, a classmate Responsible for adjusting the instrument and readings, and a student is responsible for correcting readings, record data, in addition, there is a student specifically responsible for data checking, so, in order to ensure that the measurement of the surveyor's work smoothly; another example: We divided into three groups, one group with a steel ruler, the other with a tape measure at the same time, there is a group responsible for processing data and drawing. In this way, we have a clear division of labor, unity and cooperation, and efficient completion of our measurement work.

In addition, the measurement work is complicated and complicated, including many details, such as selecting the datum point, marking, installing the instrument, adjusting the level, setting the level of the ruler, aiming at the target, recording data, processing the data and checking the error. So many details, to say which is more important, in fact, each aspect is very important, each step can not be errors, or it may retest, to bring unnecessary trouble measurement. To give an example: a vertical ruler, a central level of a circular level, when the ruler to try to bubble in the middle position, which is a technical live, you need to Mozhun the law can be fast and accurate to the standard foot righting , But can not arbitrarily put the ruler to the ground a stand, otherwise it will make the data deviation and need to re-test, delay measurement process. Therefore, the measurement must develop a serious and careful work attitude.

The measurement practice, but also let me understand the hardships of construction and measurement of the importance of the work. In order to ensure that internships can be completed on time, our group members get up almost at six o'clock every morning, arrive at the measuring location, place the instruments, then take turns to eat breakfast, and sometimes do not take a nap at noon , The afternoon until dark can not see the time Hou back to dinner, to stay later also stay up to the day of data processing, often to 12 o'clock in order to go to bed ... ... the whole week is so, we all Very hard. However, in my view, although a little tired, a little hard, this a few

Days is my most fulfilling days. Because in the past few days inside, I not only learned a lot of classroom learning not the measurement of knowledge, but also to develop some good habits, which for my future development will be of great help. Measurement practice is about to end, I will sum up the practice of this pros and cons, find their own shortcomings, and through future efforts to learn to make up for my shortcomings, prepare for the future career in order to achieve greatersuccess!

工程人员英文自我评价 篇3

First of all, I was a farmer's child, grew up in rural areas, the village gave me nurtured into a strong self-reliance, although she is not the city's wonderful, but better able to experience the true story of that struggle, I always think in the countryside Growing up is one of the best life experiences, and later, I carry the others and their own expectations straight up the pole on the university.

The University is a place where I can really grow up. "The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.

I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) .In addition to these "business", the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.

I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social work.University summer school I organized a "three rural" reservoir safety research activities, experience in the heat Summer job I have seized the opportunity to do two "summer internship" - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work experience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: "pragmatic idealist"! Because to achieve the ideal must be pragmatic.

Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.